Divi Solar Starter: Explain Quote Assumptions and Project Inquiries

By Dave TanguayPublished Updated Editorial draft

Quick Answer

A solar installer website should explain the actual service, the information needed for a project inquiry and how an estimate becomes an approved proposal. Replace the Divi Solar starter’s demonstration savings, project totals and credentials with owner-approved information that applies to the real business.

Define the work visitors can ask about

The May 6, 2025 publisher introduction offers a starting website design. It does not establish an installer’s service area, qualifications, product availability or completed projects.

State the types of work the business actually accepts and the locations it serves. Have the responsible owner approve qualifications, manufacturer relationships and project photographs before publication. Distinguish a conceptual illustration from a completed installation.

Explain what a displayed estimate assumes

If the business publishes an example or calculator result, identify its purpose and the approved assumptions behind it. A figure without its applicable inputs can imply a commitment the business has not made.

Scope
Explain which work, products and project conditions the example includes, using approved information.
Inputs
Identify the information used and the conditions that still require project review. Do not fill gaps with invented household or production figures.
Evidence and date
Record the source, responsible reviewer and date for any performance or savings statement.
Next decision
Explain what the business must review before issuing a project-specific proposal.

Do not copy demonstration savings, incentive or financing language into the real offer. Keep any approved estimate explanation consistent across the home page, service pages, calculator and inquiry confirmation.

Ask for the next useful project detail

An initial inquiry can ask for a contact method, general project location and a broad description of the work. Explain the next contact step. Request additional documents only through the business’s approved process when needed; a public form need not invite full utility account details or unrelated personal records.

Use associated field labels and feedback that identifies missing information. Describe a submission as a request until the actual business process confirms an appointment, assessment or proposal.

Review the imported site as a whole

Follow the current Quick Sites instructions in a working copy. Check sample products, prices, articles, contact details and shared templates, as well as the visible landing page.

Trace an authorized test inquiry to its intended recipient and compare the confirmation with the promised next step. Our web design service can help create a site around approved services, project evidence and a clear inquiry process.

Key Takeaways

  • Publish the actual service scope and approved project evidence.
  • Explain the assumptions and limits of any approved estimate.
  • Ask for proportionate inquiry details and state the next step.

Frequently Asked Questions

Can the starter’s savings figures become our offer?

Only publish statements supported and approved for the actual business and applicable conditions. Demonstration figures do not provide that evidence.

Does an inquiry need to collect a full utility bill?

Keep the first step proportionate. Explain the approved route for any documents the business needs later.

Does a submitted form confirm an installation quote?

Describe the actual process. A request should not imply a confirmed assessment or proposal before the business has completed its required review.

Archives